Ordering organization Name of construction Completion date
Busan Environment Corporation Haeundae Office Initial settling plant 3way inflow gate repair 2016-01-22
Samyoung global Co., Ltd. Manufacture, install RABC microorganism incubation tank 2016-01-26
Samyoung global Co., Ltd. Manufacture and deliver RABC Pilot Plant during H project 2016-01-26
Busna Environment Corporation Suyeong Office 1st Step inflow pump (line-8) repair construction 2016-01-29
Busan leather marine product processing business cooperative Busan leather marine product processing business cooperative tertiary pressure floatator installation construction 2016-02-03
Jinju-si Sewerage Division Jinju public sewage treatment facility settling basin skip-hoist repair construction 2016-02-22
Busan Gangseo District Office East drainage pumping site jib crane inflow pump etc. 6 replacements 2016-03-02
Busan Environment Corporation sanitary office Distribution fine screen(No.3) improvement construction 2016-03-04
Busan Environment Corporation Noksan Office Sludge thickener B sludge collector center gauge repair 2016-03-21
Busan leather marine product processing business cooperative Busan leather marine product processing business cooperative tertiary pressure flotation tank installation construction 2016-03-31
Jinju-si Sewerage Division Jinju public sewage treatment facility organism responser mixing reducer replacement construction 2016-04-29
Busan Environment Corporation Central Office Wholesale market influent pipe quarterly construction 2016-05-03


2015

Ordering organization Name of construction Completion date
Busan Gangseo District Office Noksan drainage pump station disaster restoration construction 2015-01-10
Busan Environment Corporation Haeundae Office Sewage sludge transfer pump replacement construction 2015-04-13
Busan Sasang-gu Office Manufacture and install Gamjeon2 drainage decrepit pump (submerged pump(No8)) 2015-06-23
Jinju-si water supply and sewerage office sewage division Jinju public sewage treatment facility Repair work for rotary screen unit B 2015-04-06
SP Hightech Corp. Manufacture and replace Suyeong 1st step longitudinal collector 2015-05-15
Busan Environment Corporation Suyeong Office Food dreg dehydrator replacement construction 2015-06-07
SP Hightech Corp. Manufacture and install Saenggok organism responser mixer 2015-06-29
Busan Environment Corporation Suyeong Office Desulfurizer desulfurizing agent replacement construction 2015-05-12
SP Hightech Corp. Manufacture and replacement of Hwamyeong sedimentation tank sludge collector drive uni 2015-07-12
Gumi Facility Corporation Inflow screw pump machine B repair (Gumi sewerage handling team) 2015-05-17
Seyoung Industry Corp. Masan food recycling treatment plant food waste injection hopper and storage installation construction 2015-07-30
Busan City Construction International industry distribution city (zone 1) drainage station water pump purchase 2015-10-30
Busan Hwamyeong filtration plant dehydrator, deodorizer facility installation construction, manufacture and install deodorizer 2015-10-29
Busan Transportation Corporation Manufacture and install line 1 extension (multi-section) main line(#14,15) ventilation equipment 2016-12-30
Gyeongbuk Goryeong-gun Cooling tower-livestock excretion public treatment plant cooling facility installation construction 2015-07-26
Busan Manufacture and install water reservoir chlorine injection facility installation machine construction, chlorine injection facility 2015-12-23
Saewon Constructions Corp. Jinju food waste public treatment facility defect repair construction 2015-07-31
DMNtech Corp. Sinpo drainage plat damping facility additional manufacturing and installation 2015-08-11
Seoban Industry Engineering Corp. Deokcheon wastewater mediation pumping station relocation construction 2016-06-15
Taehyeon ENG Gamjeon reservoir multi-functional undercurrent facility installation construction-hoist 2015-02-07
Busan leather marine product processing business cooperative Busan leather marine product processing business cooperative tertiary pressure flotation tank installation construction 2016-02-28
Hojin Construction Hwamyeong Purification Plant(No.6) repair construction 2015-12-20
Samho Co., Ltd. Minlak medication pumping station bucket grit elevator (A.B) repair 2015-09-15
Yooseong Engineering Jinju nonpoint pollution source treatment facility-bucket grit elevator 2015-12-31
Samyoung Global Co., Ltd. RABC Pilot Plant manufacturing and installation construction 2015-01-08
Social welfare foundation participation in the Vietnam war comradeship Suyeong sludge collector demolish work 2015-11-30


2014

Ordering organization Name of construction Completion date
Jinju-si sewage project manager Jinju public sewage treatment facility 2nd step organism responser mixing reducer replacement repair construction 2014-02-13
Busan Environment Corporation Gijang Office Munoseong manhole pumping station water pump purchase 2014-03-19
Songik Construction Corp. Hwamyeong standing filter pipe replacement 2014-06-12
Busan Environment Corporation Suyeong office Desulfurizer desulfurizing agent replacement construction 2014-04-21
Shinhyeon Fisheries Corp. Shinhyeon Fisheries wastewater treatment plant construction 2014-06-17
Busan Gangseo district office Noksan drainage pump station fine screener chain replacement 2014-05-17
Gyeongbuk Gumi-si water supply and sewerage office Gumi sewage treatment plant harmful substance removal facility installation construction, purchase government-furnished material 2014-12-26
HongchangMNT Corp. Condense water pump and 2 others 2014-04-23
Busan water supply business HQ facility management office Manufacture and replace return booster station non-efficient pump 2014-11-05
Busan water supply business HQ facility management office Myeongjeong Purification Plant Iptan filter structure improvement machinery construction, manufacture and purchase back washing water supply pump 2014-11-01
Hojin Construction Corp. Hwamyeong Purification Plant settling basin (No.5) repair construction 2014-10-10
Busan Environment Corporation sanitary office Distribution fine screen repair construction 2014-07-17
Ulsan Ulju-gun Recycling product center, screening conveyor purchase 2014-07-13
The Joeun Slduge collector chain etc. (Seonam environment sludge collector) 2014-08-15
Shinhwan ENC Soft axis screw conveyor 2014-08-05
Korea Environment Corporation Gyeongnam-district HQ Ulleung incineration plant hoist purchase 2015-09-29
Daejin Injustry Facility Central organism responsor pipe facility replacement construction 2015-02-08
YBLoad Load Cheongdo Youngchang leather construction wastewater treatment plant repair construction 2015-05-10
Busan Environment Corporation Haeundae office Surplus sludge pullout pump replacement construction 2014-12-28
Saejeong ENG Desing Maekdo drainage pump station 2014-11-11
Jinju-si sewage project manager inju public sewage treatment facility dreg rotary screen (Machine A) repair construction 2014-12-24
Shinhyeon Fisheries Corp. Underground acid facility construction 2014-11-10


2013

Ordering organization Name of construction Completion date
Busan Construction HQ Scum hopper and container [Noksan sewage treatment plant uninstalled machinery installation construction] 2013-05-10
Jinju-si sewage project manager inju public sewage treatment facility dreg rotary screen (Machine A) repair construction 2013-02-04
Busan Construction HQ Scum export crane [Noksan sewage treatment plant uninstalled machinery installation construction] 2013-05-18
Busan Environment Corporation Gangbyeon office Gangbyeon office 1st step inflow pump No.3 gear coupling repair construction 2013-03-15
Busan Gangseo district office Noksan drainage pump plant belt conveyor and 2 other repair construction 2013-02-20
Gumi facility corporation Dry sludge export conveyor(M9115) Urgent repair and purchase government-furnished material 2013-03-16
Jinju-si sewage project manager Jinju public sewage treatment facility 1st step anaerobic mixing reducer replacement 2013-04-22
Busan Gangseo distric office Manufacture and install Shinpo drainage pump plant dreg transferring device 2013-05-06
Busan Environment Corporation Gangbyeon office Decantar sludge supply pump and 1 other repair construction 2013-05-04
Buwon GFC Hwamyeong Purification Plant water reservoir (No.4) repair construction 2013-06-30
Hanha Indusry Suyeong office 2nd step sludge collector 2013-07-31
Jinju-si sewage project manager Jinju public sewage treatment facility fine screen(Machinery A) repair construction 2013-06-04
Busan Gangseo district office Noksan drainage pump plant screener drive chain replacement construction 2013-06-23
Busan Gangbyeon sewage decrepit mechanical equipment(inflow pump) replacement 2013-11-21
Jinju-si sewage project manager Jinju public sewage treatment facility 1st step A-affiliation initial settling basin sludge collector repair 2013-07-19
Gyeongwoon Byumyang Energy Jinju public sewage treatment facility concentration sludge collector and 2 other facility repair construction 2013-07-22
Gumi facility corporation Dehydration sludge transfer conveyor urgent repair, government-furnished material 2013-08-24
Gyeongbuk Gumi-si water supply and sewerage offic Gumi wastewater treatment plat screw pump urgent repair construction 2013-10-09
Jinju-si sewage project manager Daegok treatment plant settling dreg transfer conveyor maintenance construction 2013-11-14
TaegeukENtech Gumi wastewater treatment plant concentration sludge collector repair construction 2013-12-12
Busan Environment Corporation Nambu office Nambu office chain and component for settling basin purchase 2013-12-30
Gumi facility corporation Inflow screw pump (machinery A) repair 2013-12-12
Jinju-si sewage project manager Jinju public sewage treatment facility 1st organism responser mixing reducer replacement repair construction 2013-12-19
Hongchang M&T Complex useful microorganism application method 2013-11-22
Seyoung Industry Jinju public sewage treatment facility ventilator building ventilation facility replacement construction 2013-12-19
The Joeun The Joeun factory expansion pipe installation and sewage pipe construction 2013-08-31


2012

Ordering organization Name of construction Completion date
Jinju-si water supply and sewerage office sewage division Belt conveyor(Jinju public sewage treatment facility total phosphorus treatment facility installation construction-cake conveyor) 2012-02-29
Green ENG Mieum district water reservoir machinery facility installation construction 2012-06-19
Gyeongbuk Goryeong-gun chemical injector (automatic dissolution device-Goryeong sewage treatment plant total phosphorus treatment facility installation construction) 2012-02-25
Chungbuk Chungwon-gun water supply and sewerage office Ochang sewage treatment plant building construction –3rd order government-furnished material-diffuser purchase request 2012-04-27
Wongwang constructions Machinery installation constructions from Jinju public sewage treatment facility total phosphorus treatment facility installation construction(conveyor installation construction) 2012-03-12
Korea Environment Corporation Honam-region HQ Manufacturing Korea Environment Corporation Honam-region HQ Damyang factory fixing type crane 2012-02-24
Busan Education Office Busan Tourism High School Busan Tourism High School accommodation for the disabled installation construction 2011-03-04
Jinju-si sewage project manager Jinju public sewage treatment facility fine screener(No.3) repair maintenance construction 2012-02-14
Busan Environment Corporation Gangbyeon office 1st step inflow pump bottom bearing and 1 other repair 2012-02-14
Korea Land & Housing Corporation Busan Ulsan region HQ Hoist(West Busan distribution drainage pump construction supply material hoist purchase) 2012-04-20
Jinji-si water supply and sewerage office sewage division Best conveyor (Jinju public sewage treatment facility total phosphorus facility installation construction government supply-cake conveyor-additional purchase request) 2012-04-30
Jinji-si water supply and sewerage office sewage division Jinju public sewage treatment facility dreg rotary screen repair construction 2012-04-21
Busan Environment Corporation Dadae office Filter dust collector decrepit facility etc. repair construction 2012-04-05
Busan Environment Corporation Suyeong office Desulfurizer desulfurizing agent replacement constructions 2012-04-26
Jangmin Construction Hwameyong-filter pipe replacement construction-manufacture and install pipe line 2012-06-25
Busan conditioning equipment valve replacement construction 2012-06-26
Jinji-si water supply and sewerage office sewage division Jinju public sewage treatment facility settling basin bucket grit elevator B repair construction 2012-05-30
Busan Environment Corporation Nambu office Decantar sludge supply pipe (line1,3) repair construction 2012-06-14
Busan Environment Corporation Suyeong office 1st step settling washing conveyor repair 2012-06-14
KOWAS Decrepit pipe replacement construction from Hwamyeong Purification Plant water reservoir (No.3) repair construction 2012-09-20
Gumi facility corporation Purchase private filter washing brush 2012-07-05
Busan sports facility management office Gangseo sports park Heat exchanger and 1 other replacement repair 2012-07-02
Busan Environment Corporation Gangbyeon office 1st step inflow pump machinery No.3 and 1 other repair 2012-08-06
Gyeongnam Tongyeong-si Inflow pump plant inflow pump (establishment A) repair construction 2012-07-10
Busan Environment Corporation Gangbyeon office Bottom medium pump plant inflow pump No.1 reducer repair 2012-07-22
Jinji-si water supply and sewerage office sewage division Jinju public sewage treatment facility settling basin bucket grit elevator C repair construction 2012-08-31
Busan Environment Corporation Dadae office Filter dust collector etc. repair construction 2012-09-05
Busan Education Office Busan Dongrae office of education Dalbuk Elementary and 3 other school¡¯s air conditional installation construction 2012-11-30
Busan Environment Corporation Gangbyeon office 2nd step RCS chemical pump repair construction 2012-10-08
Gumi facility corporation Dry sludge transfer link conveyor urgent repair 2012-10-12
Jinji-si water supply and sewerage office sewage division Jinju public sewage treatment facility settling basin bucket grit elevator A sprocket replacement construction 2012-10-15
Busan Gangseo district office Shinpo drainage pump plant belt conveyor reinforcement and inflow water gate repair 2012-11-15
Busan Gangseo office Noksan 1 water gate motor hoist replacement construction 2012-12-03
Busan Environment Corporation Nambu office Settling basin sludge collector type chain purchase 2012-12-27
International marine product wholesales management office Security district lighting tower protector installation construction 2012-12-06
Busan Environment Corporation Central office Amnam mediation pump plant bucket grit elevator component purchase 2012-12-25


2011

Ordering organization Name of construction Completion date
Jinju-si sewage project manager Jinju public sewage treatment facility settling basin fine screen repair construction 2011-03-07
Busan Environment Corporation Dadae office Manufacture and purchase incinerator grate girder 2011-03-14
Busan Environment Corporation Gangbyeon office fine settling sludge dreg separator (no.2) repair 2011-03-28
SM Tech Water intake station chloride injector water inflow pipe relieve valve installation 2011-04-28
Green ENG Water intake station establishment affiliation water impact prevention tank pipe replacement construction 2011-04-23
Samyang Construction Fine screen (Double change type frontal salvage2.2kw) repair construction 2011-04-30
Busan Environment Corporation Gangbyeon office 1st step inflow pump(No.2,4,5) bottom bearing and 1 other repair 2011-06-26
Gyeongnam Tongyeong-si Inflow pump plant inflow pump repair construction 2011-07-23
Busan Environment Corporation Suyeong office Manufacture and purchase 2nd step bucket grit elevator¡¯s bucket 2011-07-11
J-one Deoksan sludge treatment plant assistance bannage maintenance construction 2011-08-04
KOWAS Decrepit pipe replacement construction from Hwamyeong Purification Plant water reservoir(no.2) repair construction 2011-10-25
Busan Environment Corporation Dadae office Incineration facility decrepit facility repair construction 2011-10-06
Busan Environment Corporation sanitary office fine screen dreg storage hopper installation factory 2011-10-24
Jinji-si water supply and sewerage office sewage division Belt conveyor (Jinju public sewage treatment facility total phosphorus treatment facility installation construction- cake conveyor) 2012-01-03
Busan Environment Corporation Dadae office Resident convenience facility shower station and heating pipe etc. repair constructions 2011-10-25
Green ENG Mieum district water reservoir machinery facility installation construction 2011-12-21
Busan Environment Corporation Suyeong office fine settling sludge dreg separator(no.2) repair 2011-11-17
Gumi-si facility management corporation Purchase private filter filtration washing brush and washing brush shaft 2011-10-29
Gyeongbuk Goryeong-gun Chemical injector (Automatic dissolution device-Goryeong sewage treatment plant total phosphorus treatment facility installation construction) 2011-12-30
Chungbuk Cheongwon-gun water supply and sewerage office Ochang wastewater treatment plant construction-3rd order government-furnished material-diffuser purchase request 2012-04-27
Busan Environment Corporation Gangbyeon office Umgoon E reducer repair and bottom bearing(C,D,E) replacement 2011-12-15
Gumi facility management corporation sludge screw conveyor(rotary) repair 2011-12-21
Wongwang Construction Machinery construction (conveyor installation construction) from Jinju public sewage treatment facility total phosphorus treatment facility installation construction 2012-03-12
Korea Environment Corporation Honam-district HQ Korea Environment Corporation Honam district HQ Damyang factory fixing type crane manufacturing 2012-02-24
Busan Education Office Busan Tourism High School Busan Tourism High School accommodation for the disabled installation construction 2011-03-04


2010

Ordering organization Name of construction Completion date
Busan Environment Corporation sanitary office Distribution fine screen (No.1) repair construction 2010-02-12
Busan Environment Corporation Noksan office Myeongji mediation pump plant decrepit valve replacement construction 2010-03-02
Busan water supply HQ Gangseo office Industrial water settling basin domestic water supply pipe attachment construction(machinery) 2010-03-07
Busan Environment Corporation Suyeong office Sludge collector(manufacture and replace initial settling basin sludge collector) 2010-06-12
Busan water supply HQ Deoksan Purification office 3rd Purification pure pipe and 1 other installation 2010-03-17
Busan Environment Corporation sanitary office Distribution fine screen and exhaust line repair construction 2010-03-30
Busan water supply HQ Deoksan Purification office Renewable facility water pipe replacement 2010-03-31
Busan Environment Corporation Myeongji office Incinerator bottom hopper rotary valve installation factory 2010-04-12
Jinju-si sewage project manager Jinju public sewage treatment facility settling basin fine screen transfer conveyor repair 2010-04-29
Busan water supply HQ Hwamyeong Purification Office Manufacture and install Hwamyeong bannage sludge collector gable reel 2010-05-07
Busan Environment Corporation Nambu office Manufacture and purchase Minlak mediation pump plant settling wash facility 2010-07-07
Busan water supply HQ Deoksan Purification Office 3 purification sampling pump and 2 other replacement 2010-05-03
Gumi-si water supply HQ Manufacture and replace 2nd settling basin screw press and belt conveyor 2010-07-21
Busan water supply HQ Gangseo office Intake pump repair construction 2010-05-31
Gumi-si water supply HQ Manufacture and install gas refinement desulfurization and pressor facility 2010-09-09
Jinju-si sewage project manager Jinju public sewage treatment facility settling conveyor repair construction 2010-07-04
Busan water supply HQ facility management office Amnam 2BP booster station and 6 other facility repair construction 2010-07-07
Jinju-si sewage project manager Jinju public sewage treatment facility bucket grit elevator(No.2) repair construction 2010-07-17
Pukyong National University Building 4 restroom sanitary facility repair construction 2010-09-03
Jinju-si sewage project manager Jinju public sewage treatment facility 1st step initial settling basin sludge collector reducer replacement construction 2010-09-22
Busan water supply HQ Hwamyeong Purification Office Manufacture and install Hwamyeong bannage (no.1) sludge collector cable reel 2010-10-07
Busan water supply HQ Deoksan Purification office standing regeneration room waste heat boiler custom and 4 other repair 2010-10-07
Gumi-si facility management corporation 1st, 2nd step raw sludge transfer pump replacement construction 2010-11-19
Jinju-si sewage project manager Jinju public sewage treatment facility fine screen (Machinery B) repair construction 2010-11-30
Busan Environment Corporation Noksan office settling basin fine screen (no.4) repair construction 2010-12-10
Busan water supply HQ Deoksan Purification Office 1st, 2nd purification plant private filter drainage valve(250A) and 1 other repair construction 2010-12-25
DY Construction Gumi wastewater treatment plant inflow pump plant screw pump material delivery and installation payment 2010-12-20


2009

Ordering organization Name of construction Completion date
Hwamyeong Purification office 1st purification plant settling basin(no.14) sludge collector repair 2009-02-28
Hwamyeong Purification office Mulkum new pump plant pump and 7 other repair/tear down 2009-03-02
Environment facility corporation sanitary office 2nd treatment plant predam aeration blower replacement construction 2009-03-30
Busan city hall Cooling tower(south) cooling fan etc. repair construction 2009-04-13
Gwangdeok Construction Top and bottom bearing of inflow pump replacement and reducer repair 2009-02-13
Gumi-si facility management corporation Sengok-li town sewage filter installation construction 2009-04-29
Facility management office Geumgok pressurization pump motor and 3 other maintenance construction 2009-04-17
Busan Environment Corporation Suyeong office food waste treatment plant central predam sediment transfer conveyor repair construction 2009-05-04
Busan water supply HQ Gangseo office Balancing tank aeration blower installation construction 2009-05-09
Busan water supply HQ Deoksan Purification office Maeri 2nd settling basin mono-pump water supply pipe replacement and 2 other constructions 2009-05-18
Gumi-si water supply and sewerage office Manufacture and install methane gas pipe and desulfurizer 2009-08-22
Busan water supply HQ Hwamyeong purification office Manufacture and replace existing chemical room chemical aid tank protection steel sheet 2009-06-18
Busan water supply HQ Deoksan Purification office Maeri 1st settling basin band screen(no.5) frame manufacturing, replacing and other constructions 2009-06-21
Gumi-si facility management corporation Organism responser display device repair 2009-06-24
Busan Environment Corporation sanitary office 2nd treatment plant predam acid line repair construction 2009-06-30
Busan Environment Corporation Suyeong office 2nd step fine settling collector(F-1) and 1 other repair construction 2009-07-21
Busan water supply HQ Deoksan Purification office Sludge treatment plant ventilation facility and 4 other repair 2009-07-21
Busan Environment Corporation Suyeong office Manufacture and purchase Suyeong office 2nd sludge collector chain 2009-09-14
Gumi-si Facility management corporation 2nd step prior settling basin fine screener replacement construction 2009-08-21
Busan Environment Corporation sanitary office 3rd treatment plant excreta transfer pipeline replacement construction 2009-09-21
Busan water supply HQ Hwamyeong Purification office Hwamyeong Maekdong settling basin Maekdong control valve(2500mm) replacement 2009-10-09
Busan water supply HQ Deoksan Purification office 3rd purification receiving tank chemical injection pipe and 1 other replacement 2009-11-06
Environment corporation Suyeong facility Surplus sludge dreg separator repair construction 2009-12-09
Busan water supply HQ Deoksan Purification office Concentration overflow collecting pump replacement and 3 other repair 2009-12-27
Environment corporation Myeongji office Gongjang-dong dust scattering prevention construction 2009-12-28


Environment management field

2016

Year/Month Ordering organization Location Construction name Volume Notice
2016.01 Jinju-si sewage project manager Jinju-si Settling basin skip-hoist construction ¡¡ ¡¡
2016.02 Busan Environment Corporation sanitary office Busan-si Distribution fine screen improvement construction ¡¡ ¡¡
2016.03 Busan Environment Corporation Noksan office Busan-si Sludge collector center gauge construction ¡¡ ¡¡
2016.03 Busan Environment Corporation Suyeong office Busan-si 1st step longitudinal collector manufacturing and replacement ¡¡ ¡¡
2016.03 Busan Environment Corporation Myeongji office Busan-si Fly ash transfer conveyor repair construction ¡¡ ¡¡
2016.03 Busan Environment Corporation Gangbyeon office Busan-si Gamjeon pump plant no.2 screw wing replacement ¡¡ ¡¡
2016.03 Jinju-si landfill Jinju-si Manufacture replace transfer screw conveyor ¡¡ ¡¡
2016.04 Busan Bukgu-office Busan-si Deokcheon latex screener purchase ¡¡ ¡¡
2016.04 Busan Environment Corporation Suyeong office Busan-si Sludge collector manufacture(install) and replace ¡¡ ¡¡
2016.05 Jeongdo Tuna Busan-si Waste water treatment facility installation construction 5§©/day ¡¡
2016.06 Jinju-si water supply office Jinju-si 1st, 2nd purification plant condensation facility supplementation ¡¡ ¡¡
2016.06 Jinju-si water supply office Jinju-si 2nd purification plant condensation facility scum remover installation ¡¡ ¡¡
2016.06 Busan Construction HQ Busan-si Nambu settling washing device replacement ¡¡ ¡¡


2015

Year/Month Ordering organization Location Construction name Volume Notice
2015.02 Busan Environment Corporation Haeundae office Busan-si primary treatment facility supplementation 500,000§©/day ¡¡
2015.03 Busan Environment Corporation Suyeong office Busan-si Food dehydrator replacement 200,000§©/day ¡¡
2015.03 Busan Environment Corporation Central office Busan-si Nitrification tank(10 ground) repair ¡¡ ¡¡
2015.03 SP Hightech Busan-si Manufacture and install Senggok organism response mixer ¡¡ ¡¡
2015.04 Central EMC Busan-si Shinpo drainage pump plant design ¡¡ ¡¡
2015.04 SP Hightech Busan-si Hwamyeong purification plant sludge collector installation ¡¡ ¡¡
2015.04 Gyeongbuk Gumi corporation Gyeongbuk Gumi-si Inflow pump replacement and repair 330,000§©/day Drainage treatment plant
2015.05 Jinju city hall Gyeongnam Jinju-si Excreta treatment facility supplementation ¡¡ Excreta treatment facility (A2O method)
2015.05 Saeyoung Industry Gyeongnam Masan-si Food waste treatment facility supplementation ¡¡ ¡¡
2015.06 Busan Busan-si Hwamyeong purification deodorizing facility installation ¡¡ ¡¡
2015.06 Busan Transportation corporation Busan-si subway line 1 diffuser facility ¡¡ ¡¡
2015.06 Gyeongbuk Goryeong-gun Gyeongbuk Goryeong-gun livestock excretion treatment facility organism responser improvement 150§©/day livestock excretion treatment facility (A2O method)
2015.07 Jinju city hall Gyeongnam Jinju-si Manufacture/install bucket grit elevator ¡¡ sewage treatment facility
2015.08 Busan Construction HQ Busan-si Wastewater treatment facility supplementation construction ¡¡ central office
2015.09 Busan Construction HQ Busan-si Wastewater pump plant ¡¡ Deokcheon-dong
2015.09 Jinju-si water supply and sewerage office Jinju-si Jinju-si nonpoint pollution source treatment facility installation ¡¡ ¡¡
2015.10 Busan Construction HQ Busan-si Gamjeon reservoir multi-function undercurrent facility installation construction ¡¡ ¡¡
2015.10 Busan Environment Corporation Suyeong office Busan-si Purchase food treatment plant food transfer pump ¡¡ ¡¡
2015.10 Jinju-si water supply office Jinju-si Settling fine screener component replacement ¡¡ ¡¡
2015.12 Samyoung global Gyeonggi-do Yongin Manufacture and deliver RABC Pilot Plant ¡¡ Tancheon sewage treatment plant
2015.12 Busan Construction HQ Busan-si Nambu public sewage treatment facility improvement work ¡¡ ¡¡


2014³â

Year/Month Ordering organization Location Construction name Volume Notice
2014.01 Jinju-si sewage project manager Gyeongnam Jinju-si Organism responser improvement 150,000§©/day sewage treatment facility (A2O method)
2014.03 Gumi corporation Gyeongbuk Gumi-si Internal return facility installation 330,000§©/day ¡¡
2014.03 Busan Environment Corporation Suyeong office Busan-si Desulfurizing facility replacement 452,000§©/day ¡¡
2014.03 Shinhyeon Fisheries Busan-si Wastewater treatment facility installation ¡¡ Wastewater treatment facility (A2O method)
2014.04 Gyeongbuk Gumi-si water supply and sewerage office Gyeongbuk Gumi-si Sewage harmful substance treatment facility installation ¡¡ ¡¡
2014.05 Busan Environment Corporation Jeonggwan office Busan-si Sludge collector installation 40,000§©/day ¡¡
2014.06 Jinju-si sewage project manager Gyeongnam Jinju-si Organism responser improvement 150,000§©/day sewage treatment facility (A2O method)
2014.06 Gyeongbuk Uljin-gun Gyeongbuk Uljin-gun Food waste treatment facility machinery installation construction ¡¡ ¡¡
2014.07 The Joeun Busan-si Sludge collector installation ¡¡ ¡¡
2014.07 Shinhwan ENC Busan-si Cake transfer facility installation ¡¡ ¡¡
2014.09 Busan Environment Corporation Jeonggwan office Busan-si Initial settling basin repair 40,000§©/day ¡¡
2014.10 Busan Gangseo district office Busan-si Noksan drainage pump plant screen supplentation ¡¡ ¡¡
2014.10 YB Load China Laixi Cheongdo Youngchang leather wastewater treatment plant supplementation 3,000§©/day leather wastewater (A2O method)
2014.10 Busan Environment Corporation Haeundae office Busan-si Organism responser supplementation 65,000§©/day ¡¡
2014.10 Central EMC Busan-si Shinpo drainage pump plant design ¡¡ ¡¡
2014.10 Sejeong ENG Busan-si Makdo drainage pump plant design ¡¡ ¡¡
2014.11 Shinhyeon Fisheries Busan-si Wastewater treatment plant supplementation 50,000§©/day ¡¡


2013

Year/Month Ordering organization Location Construction name Volume Notice
2013.01 Busan construction HQ Busan-si Cake hopper replacement ¡¡ Sewage treatment facility
2013.01 Busan Environment Corporation Gangbyeon office Busan-si Final settling basin supplementation 450,000§©/day Sewage treatment facility
2013.02 Gwangdeok Construction Gyeongnam Tongyoung-si Organism responser supplementation 54,000§©/day Sewage treatment facility
2013.03 Gumi Corporation Gyeongbuk Gumi-si Goa agricultural industrial complex high level treatment facility construction 330,000§©/day Sewage treatment facility (A2O method)
2013.03 Jinju-si sewage project manager Gyeongnam Jinju-si Jinju sewage air-free tank facility replacement 150,000§©/day Sewage treatment facility (A2O method)
2013.04 Busan Gangseo district office Busan-si Shinpo drainage pump plant screener installation ¡¡ ¡¡
2013.04 Busan Environment Corporation Gangbyeon office Busan-si Dehydration facility supplementation 450,000§©/day ¡¡
2013.05 Buwon GFC Busan-si Hwamyeong Purification plant supplementation ¡¡ ¡¡
2013.05 Hanha Industry Busan-si Suyeong sewage sludge collector replacement ¡¡ ¡¡
2013.05 Busan Environment Corporation Nambu office Busan-si Sludge collector supplementation 340,000§©/day ¡¡
2013.05 Busan Gangseo district office Busan-si Noksan drainage pump plant screener supplementation ¡¡ ¡¡
2013.07 Gyeongwoon Bumyang Energy Gyeongnam Jinju-si Concentration tank replacement construction ¡¡ ¡¡
2013.07 Busan Environment Corporation Noksan office Busan-si Initial settling basin supplementation 80,000§©/day ¡¡
2013.08 Gumi Corporation Gyeongbuk Gumi-si High level treatment facility supplementation 330,000§©/day ¡¡
2013.10 Gumi Corporation Gyeongbuk Gumi-si Sludge dehydration facility supplement 330,000§©/day ¡¡
2013.10 Jinju-si sewage project manager Gyeongnam Jinju-si Dehydration facility supplementation 150,000§©/day ¡¡
2013.10 TaegeukENTech Gyeongbuk Gumi-si assimilation tank supplementation construction ¡¡ ¡¡
2013.09 Hongchang M&T Gyeongbuk Youngcheon Organism responser improvement ¡¡ Wastewater treatment facility (A2O method)
2013.11 Seyoung Industry Gyeongnam Jinju-si Deodorization facility installation ¡¡ ¡¡
2013.12 Busan Environment Corporation Gijang office Busan-si Deodorization facility installation 27,000§©/day ¡¡


2012³â

Year/Month Ordering organization Location Construction name Volume Notice
2012.01 Water supply work HQ Hwamyeong Purification office Busan-si Concentration facility replacement ¡¡ ¡¡
2012.02 Water supply work HQ Myeongjang Purification office Busan-si Dehydration building repair construction ¡¡ ¡¡
2012.02 Gumi Corporation Gyeongbuk Gumi-si Air-free tank mixer replacement 330,000§©/day Sewage treatment facility
2012.02 Busan Environment Corporation Nambu office Busan-si Dehydration machine room supplementation 340,000§©/day Sewage treatment facility
2012.03 Water supply work HQ Myeongjang Purification office Busan-si Surplus facility supplementation ¡¡ ¡¡
2012.03 Busan Environment Corporation Suyeong office Busan-si Desulfurizer replacement 452,000§©/day Sewage treatment facility
2012.06 Gumi Corporation Gyeongbuk Gumi-si Filter supplementation 330,000§©/day Sewage treatment facility
2012.06 Busan Environment Corporation Gangbyeon office Busan-si Inflow pump plant supplementation 450,000§©/day Sewage treatment facility
2012.06 Busan Environment Corporation Gangbyeon office Busan-si Mediation pump plant supplementation 450,000§©/day Sewage treatment facility
2012.06 Jinju-si water supply office Gyeongnam Jinju-si Concentration facility replacement 150,000§©/day Sewage treatment facility
2012.09 Busan Environment Corporation Noksan office Busan-si Organism responser supplementation 80,000§©/day Sewage treatment facility (A2O method)
2012.09 Gumi Corporation Gyeongbuk Gumi-si Sludge dehydrator facility 330,000§©/day Sewage treatment facility
2012.09 Jinju-si water supply and sewerage office Gyeongnam Jinju-si Settling facility supplementation 150,000§©/day Sewage treatment facility
2012.10 Busan Environment Corporation Noksan office Busan-si Sludge collector replacement 80,000§©/day Sewage treatment facility
2012.12 Busan Environment Corporation Central office Busan-si Settling facility supplementation 120,000§©/day Sewage treatment facility


2011

Year/Month Ordering organization Location Construction name Volume Notice
2011.01 Busan Environment Corporation Noksan office Busan-si Settling tank supplementation 80,000§©/day Sewage treatment facility
2011.01 Water supply work HQ Hwamyeong Purification office Busan-si Dehydration facility supplementation ¡¡ Sewage treatment facility
2011.01 Busan Environment Corporation Noksan office Busan-si 2nd settling tank supplementation 80,000§©/day Sewage treatment facility
2011.02 Jinju Sewerage office Gyeongnam Jinju-si Settling facility replacement 150,000§©/day Sewage treatment facility
2011.02 Busan Environment Corporation Dadae office Busan-si Incinerator supplementation ¡¡ Sewage treatment facility
2011.03 Busan Environment Corporation Suyeong office Busan-si 2nd settling basin supplementation 452,000§©/day Sewage treatment facility
2011.03 Busan Environment Corporation Dadae office Busan-si Dissolution device facility ¡¡ Sewage treatment facility
2011.03 Green ENG Busan-si Water hammer installation ¡¡ ¡¡
2011.04 Busan Environment Corporation Nambu office Busan-si Return line replacement 340,000§©/day Sewage treatment facility
2011.04 Samyang constructions Busan-si Livestock excretion treatment plant installation 150,000§©/day Livestock excretion (A2O method)
2011.05 Busan Environment Corporation Nambu office Busan-si Settling equipment replacement 340,000§©/day Sewage treatment facility
2011.05 Busan Environment Corporation Nambu office Busan-si Settling equipment replacement 340,000§©/day Sewage treatment facility
2011.05 Busan Environment Corporation Gangbyeon office Busan-si Inflow pump plant repair 450,000§©/day Sewage treatment facility
2011.07 Water supply work HQ Hwamyeong office Busan-si Sludge treatment facility supplementation 300,000§©/day ¡¡
2011.08 Busan Environment Corporation Suyeong office Busan-si Initial settling basin supplementation 452,000§©/day Sewage treatment facility
2011.09 Busan Environment Corporation Dadae office Busan-si Incinerator replacement ¡¡ Sewage treatment facility
2011.10 Jinju-si water supply office Gyeongnam Jinju-si Dissolution device facility 200,000§©/day Sewage treatment facility(Dissolved air flotation)
2011.07 Green ENG Busan-si Sewage treatment facility machinery construction 10,000§©/day Sewage treatment facility
2011.10 Busan Environment Corporation Suyeong office Busan-si Dreg treatment facility installation 452,000§©/day Sewage treatment facility
2011.10 Gumi Corporation Gyeongbuk Gumi-si Filter replacement construction 330,000§©/day Sewage treatment facility
2011.10 Gyeongbuk Goryung-gun Gyeongbuk Goryung-gun Dissolution treatment facility installation 6,000§©/day Sewage treatment facility (Dissolved air flotation)
2011.11 Chungbuk Cheongwon-gun water supply office Chungbuk Cheongwon-gun Sewage treatment plant machinery installation construction 4,000§©/day Sewage treatment facility
2011.11 Busan Environment Corporation Nambu office Busan-si Initial settling basin supplementation 340,000§©/day Sewage treatment facility
2011.11 Gumi Corporation Gyeongbuk Gumi-si Dehydration facility supplementation 330,000§©/day Sewage treatment facility
2011.11 Jinju-si sewage project manager Gyeongnam Jinju-si Settling facility supplementation 150,000§©/day Sewage treatment facility
2011.12 Wongwang Construction Gyeongnam Jinju-si Dissolution treatment facility machinery construction 15,000§©/day Sewage treatment facility (Dissolved air flotation)
2011.12 Busan Environment Corporation West office Busan-si SBR installation construction 15,000§©/day Sewage treatment facility (SBR)


2010

Year/Month Ordering organization Location Construction name Volume Notice
2010.01 Busan Environment Corporation sanitary office Busan-si Screen repair 200,000§©/day Sewage treatment facility
2010.02 Busan Environment Corporation Noksan office Busan-si Mediation pump plant repair 30,000§©/day Sewage treatment facility
2010.02 Busan water supply HQ Gangseo office Busan-si Settling basin repair 300,000§©/day Sewage treatment facility
2010.02 Busan Environment Corporation Suyeong office Busan-si Sludge collector repair 452,000§©/day Sewage treatment facility
2010.02 Busan water supply HQ Deoksan Purification office Busan-si Pipe construction ¡¡ ¡¡
2010.03 Busan Environment Corporation sanitary office Busan-si Screen repair ¡¡ Sewage treatment facility
2010.03 Busan water supply HQ Deoksan Purification office Busan-si Renewable facility supplementation 2,000§©/day ¡¡
2010.03 Jinju-si Sewerage office Gyeongnam Jinju-si Screen repair and replacement 150,000§©/day Sewage treatment facility
2010.04 Busan Environment Corporation Nambu office Busan-si settling washer facility replacement 340,000§©/day Sewage treatment facility
2010.04 Gumi-si Water supply and sewerage office Gyeongbuk Gumi-si Organism responser supplementation 400,000§©/day Sewage treatment facility(A2O method)
2010.05 Gumi-si water supply and sewerage office Gyeongbuk Gumi-si Desulfurizing facility replacement 330,000§©/day Sewage treatment facility
2010.06 Busan Environment Corporation Gangbyeon office Busan-si Initial settling basin supplementation 450,000§©/day Sewage treatment facility
2010.06 Jinju-si Sewearge office Gyeongnam Jinju-si Settling facility supplementation 150,000§©/day Sewage treatment facility
2010.06 Busan water supply HQ facility management office Busan-si Booster station supplementation ¡¡ ¡¡
2010.06 Jinju-si sewage project manager Gyeongnam Jinju-si Settling facility replacement 150,000§©/day Sewage treatment facility
2010.09 Jinju-si sewage project manager Gyeongnam Jinju-si Fine settling supplementation construction 200,000§©/day Sewage treatment facility
2010.09 Busan Environment Corporation sanitary office Busan-si Dehydrator supplementation ¡¡ ¡¡
2010.09 Busan Environment Corporation Suyeong office Busan-si Settling washer supplementation 452,000§©/day Sewage treatment facility
2010.10 Jinju-si Sewerage office Gyeongnam Jinju-si Bucket grit elevator replacement 150,000§©/day Sewage treatment facility
2010.10 Jinju-si Sewerage office Gyeongnam Jinju-si Fine settling supplementation construction 150,000§©/day Sewage treatment facility
2010.10 Busan water supply HQ facility management office Busan-si Booster station supplementation 200,000§©/day ¡¡
2010.10 Gumi Corporation Gyeongbuk Gumi-si 1st settling facility replacement 400,000§©/day Sewage treatment facility
2010.11 Jinju-si Sewerage office Gyeongnam Jinju-si Dreg screen supplementation 150,000§©/day Sewage treatment facility
2010.11 Jinju-si Sewerage office Gyeongnam Jinju-si fine screen supplementation 150,000§©/day Sewage treatment facility
2010.12 Busan Environment Corporation Dadae office Busan-si Dehydrator facility replacement ¡¡ Sewage treatment facility
2010.12 Busan Environment Corporation Dadae office Busan-si Incineration facility supplementation 40,000§©/day ¡¡
2010.12 DY Construction Gyeongbuk Gumi-si Internal return pump replacement 100,000§©/day Sewage treatment facility


2000 ~ 2009

Year/Month Ordering organization Location Construction name Volume Notice
2000.09 Seongju Excretion terminal treatment facility Gyeongbuk Seongju-gun high level treatment (Nitrogen, zinc) 40 kl/day Excretion treatment (A2O method)
2000.11 Dongyang Foods Gyeongbuk Gyeongsan-si Biological treatment 100 §©/day Food Process wastewatre (activated sludge)
2001.05 Cherrybro Food Gyeongbuk Gumi-si Physical, chemical, biological treatment (N.P treatment) 600 §©/day Boundary Wastewater (A2O method)
2001.09 Pohang Sewerage terminal treatment plant Gyeongbuk Pohang-si Machinery installation 10,000 §©/day high level treatment
2002.04 Songhak Jaeji Gyeongbuk Gyeongsan-si Wastewater treatment plant 10,000 §©/day Restraint wastewater (activated sludge)
2002.07 Harim Cheonha Geyongbuk Sangju-si Wastewater treatment plant 5,000 §©/day Boundary wastewater(A2O method)
2002.09 AbathBank Gyeongbuk Sangju-si Wastewater treatment plant 150 §©/day Hatchery wastewater(A2O method)
2006.06 Injae Industry Chungbuk Jaecheon-si New construction on Wastewater treatment plant 400§©/day Boundary wastewater(A2O method)
2006.07 Younghan Industry Gyoengnam Changnyeong-gun Wastewater treatment plant installation construction 500§©/day Wastewater(A2O method)
2007.01 Daegu-si agro-fishery product wholesales market management office Daegu-si Buk-gu Wastewater treatment plant high level treatment construction 1,000§©/day Butchery wastewater (A2O method)
2009.06 Youngnam LPC Gyeongnam Changnyeong-gun Wastewater treatment plant supplementation construction 700§©/day Butchery wastewater (A2O method)


KJ Complex microorganism medicine

Business Name Date
Jangrin leather corporation sludge occurrence amount reduction 2007.10
Mokpo Ipam-stream stench, green tide treatment 2008.06
China Shimyangseonnyeo-lake green tide, turbidity treatment 2009. 06
Noksan sewage treatment plant stench removal an sewage dreg reduction 2013.04
Hongchang M&T sludge reduction and stench removal 2013. 08
Hodong Food waste treatment facility bead shape organism removal and sludge reduction 2013.11
Cheongju recycling facility stench removal and pollutant load reduction 2013.11
Jinju Food waste treatment facility stench removal and sludge reduction 2014.01
Jinju Landfill settling leachate and stench removal 2014.02
Uljin-gun food recycling facility stench removal 2014.05
Fisheries wastewater treatment plant sludge reduction through SER method 2014. 05
Cheongdo, China Youngchang leather wastewater treatment plant sludge reduction using SER method 2014. 09
Jinju Sewage treatment plant sludge reduction 2015. 01


Performance gallery

INFORMATION
  • COMPANY : KOOKJEGISAN
  • CEO : Kim Deoksin
  • ADDRESS : 58, Dasan-ro 176beon-gil, Saha-gu, Busan, Republic of Korea
  • TEL : 051-266-3700 | FAX : 051-265-7500 | E-MAIL : gk3700ok@hanmail.net

  • ¨Ï 2021 Kookjegisan All rights reserved.
SITEMAP